Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13601245

- Product Categories
- Friendly Links
Information Name: | 13KW Roots blower site for fortifications |
Published: | 2014-11-10 |
Validity: | 90 |
Specifications: | 13KW |
Quantity: | 100.00 |
Price Description: | |
Detailed Product Description: | 13KW Roots blower site for fortifications by the first S & P International Machinery Co., Ltd. is a professional sales and quality are funded by the National Inspection Council 3C inspection, and SGS certification, CE certification, quality and safety have great protection. Absolute advantage in price, fast delivery. 1. High pressure air should be placed in a more stable place, the surroundings should be clean, dry and ventilated. 2. High pressure blower impeller rotation direction must be consistent with the direction of the arrow marked on the fan housing. 3. When the high pressure air work, work pressure shall not be greater than 8kpa, so as not to generate excessive heat fan and pump motor overcurrent caused damage. 13KW Roots blower site for fortifications, Taiwan high-pressure turbine prices counseling in addition to the two rotor bearing, there is no direct contact with other parts of friction. The fan bearing installation is divided into two categories. The first end bearing fan mounted in the middle of the motor frame and impeller pump body, these fans usually do not need to add grease. The second type blower end bearing is installed in the pump cover in the middle, these should be regularly pump end bearing grease (7018 high-speed grease). Once a month, three-shift continuous operation for pump should increase the number of refueling. Such pump motor fan end bearing maintenance by first class air pump. 5. Dongguan filter and silencer first general high pressure air out of gas at both ends should be timely cleaned according to the situation, in order to avoid blockage of use. Replace 6.13KW Lu blower for fortifications site: replace the bearings must be operated by a person familiar with the repair work. First loosen the pump cover screws and disassemble the parts one by one according to the order shown, the removed parts should be cleaned, and then in the reverse order of assembly. When removing, not hard to pry the impeller, application-specific Ramallah out, but do not miss the adjustment shims, to avoid affecting the factory when the regulator has good gap. 7. High pressure air is prohibited solids, liquids and corrosive gases entering the pump. The information gathered on the Internet: High-pressure turbine impeller blades by dozens of composition, which is similar to a large gas turbine impeller. Among the vanes of the air by the centrifugal force, the movement toward the edge of the impeller, where the air enters the pump chamber ring, again starting from the leaves in the same manner and then circulated. Circulating air current generated by rotation of the impeller, in order to leave the high energy pump for use. Using a dedicated fan motor, compact structure, small size, light weight, low noise, sending air dry without oil. |
Admin>>>
You are the 5786 visitor
Copyright © GuangDong ICP No. 10089450, The first General Electrical Co., Ltd. (Fujian Branch) All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 5786 visitor
Copyright © GuangDong ICP No. 10089450, The first General Electrical Co., Ltd. (Fujian Branch) All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility